Powder Metallurgy Metal Mold Injection Stainess Steel Gear

Powder Metallurgy is a High Technology Gear Metal Process with Less Chips and no Chips
  • Place of Origin: CHINA
  • Certification: ISO9001, TS16949,IECQQC080000
  • Minimum Order Quantity: 1000PCS
  • Price: 0.01~0.05USD
  • Packaging Details: NATURAL PACKAGE
  • Delivery Time: 20-30 DAYS
  • Payment Terms: T/T, , Western Union, D/P
  • Supply Ability: 100,000,000PCS
  • Product Details

    Powder Metallurgy is a High Technology Gear Metal Process with Less Chips and no Chips

    Powder metallurgy gears, in the overall powder metallurgy parts are difficult to count separately, but whether by weight or by the number of parts, powder metallurgy gears in a variety of machinery, cars, motorbikes in a far greater proportion than in other areas of powder metallurgy parts.


    Powder metallurgy gears are commonly used in various automotive engines as powder metallurgy parts, which can fully meet the dimensional accuracy requirements, especially tooth accuracy, through a forming and finishing process without other post-treatment processes. Therefore, compared with the traditional mechanical processing methods of manufacturing, in material input and manufacturing are greatly reduced, it is a typical product reflecting the characteristics of powder metallurgy.



    MaterialStainless Steel, IronColorNature
    QualityHigh Precision And High Quality, ISO9001/TS16949ProcessPowder Metallurgy Process
    Surface TreatmentPolishing, Oiled, Oxidizing BlackTolerance±0.02~±0.05mm
    PackingCarton Packaging With Bubble Or According To Your RequestsOEM OR NOTOEM
    Inspection100% Inspection

    High Light

    precision gear parts

    precision auto spares



    1668763415844598.jpg

     

    1, What’s the PM Technology?

    Powder metallurgy (PM), sometimes referred to as powdered metal sintering, is a process for manufacturing metal parts by heating compacted metal powders just below their melting points. In other words, PM is a metal shaping process that creates near-net parts from powdered metal. Sometimes, the products, manufactured by PM, are known as sintered products.

     

    PM Technology Advantage/Features

    It suit to mass production and have strong supply capacity, without environmental pollution. It suit to produce complex with porous, and its post treatment is less ,especially gear, one-time compacting, no cutting, and greatly reduce the production cost.

     

    Our Company Advantage


    1,Quality policy:

    Zero defecets, doing things to be best in one time

    Keeping improve and never stop pursuing perfect attitde

    reducing cost, and contine improve the compition of products

    2, Quality goal:

    quality rate can achieve 98%

    quality rate of half-finished products is 99%

    the failure cost is <2%

    3,Our all of products are suit ROHS standard, green parts, without any pollution.

     

    Powder Metallurgy Gear Parts Category Name:


    Automotive engine; camshaft, crankshaft timing pulley, water pump, oil pump pulley, active, driven gear, active, driven sprocket, cam, bearing cover, rocker arm, bushings, thrust plate, valve guide, intake, exhaust valve seat automotive transmission; various high and low speed synchronizer hub and components, clutch gear, cam, camshaft, slider, gearshift lever, bushings, guide block, synchronizer ring. Motorbike parts: driven gears and components, sprockets, starter pawls, ratchets, star wheels, duplex gears, spur gears, variable speed gears, pushrod cams, bushings, plain bearings, centering sleeves, driven discs, intake and exhaust valve seats Automotive and motorbike oil pumps: various oil pump gears, hubs, various oil pump rotors, cam rings Automotive and motorbike vibration dampers various pistons, bottom valve seats, guide seats Compressors various pistons, cylinder bodies, cylinder heads, valve plates, sealing rings Agricultural machinery products various bushings, rotors, bearings Others: distributor gears, planetary gears, internal gear discs, combined internal gears, various stainless steel nuts, magnetic poles

     

    Harber Service:


    1, 100% inspection before shipment.

    2, Satisfied packing, carton, wooden case, pallet,or according to your requirement.

    3, Samples are within 15 days after the receipt of the deposit. production will be finished about 25-30 days after samples confirma


    processpowder metallurgy
    applied softwarepro-e, CAD, PDF
    materialiron alloy , stainless steel, copper.
    surface finishblack, plating, PVD, polishing, sandblasting
    tolerance precision±0.02~0.05mm
    quality system100% inspection before shipment
    dimensionsas per customer's requests
    samples qty5-10 pcs(for free)
    certificationISO 9001, TS 16949, IECQQC080000
    packgaeplastic bag and carton or as customer's requests
    lead timebase on the qty of order(usually 25-30 days)

     


    Hot Tags :

    Let Us Help You Out

    If you have questions or suggestions, please leave us a message,we will reply you as soon as we can!

    Related Products You Might Also Like
    /Multi-functional-keys-for-daily-necessities-Metal-Projects.html
    Harber Multi-functional keys for daily necessities Metal Projects

    Harber MIM delivery the ripe experiences and solution through MIM process, MIM process has many advantages that other processes can not match. For example, the precision of products made by precision casting is not high, and the surface is very rough.

    /Successful-Cases/17.html
    Harber Smart Door Lock Parts Manufacturer Projects

    This is a part that one of our Polish customers needs to customize. Polish customer is one of our regular customer for 5 years. He ordered us 8 MIM parts at least here,including lock bolt, lock cylinder,door and window parts . This is a new project and need test many times.

    /Successful-Cases/16.html
    Automobile Radar Accessories FeSi3 MIM Metal Parts Projects

    This is a part that one of our China inland customers needs to customize. The customer is the top hardware assembly manufacturer in China, and has strict quality requirements. The material needed to be highly magnetic and corrosion resistant, hence the part had to go through various processes like surface coating electroless zinc nickel alloy.

    /Successful-Cases/15.html
    Sanitary Ware Valve MIM Metal Parts Project

    This is a customer who makes household water valves in Guangdong Province, China. Before choosing us, he found many MIM factories. He wants to choose a supplier to provide products with high performance, high quality and appropriate price.

    /Successful-Cases/14.html
    Harber Communication Hardware Industry MIM Metal Parts Projects

    How to Calculate the Size of Outdoor LED Display How to Calculate the Size of Outdoor LED Display

    /Successful-Cases/13.html
    Harber New Developed MIM4605(Fe2Ni) Door Lock Parts

    We already had a customer who makes intelligent lock in Fenland and cooperated since year 2012. Until now, Harber had developed at leaset 50 kinds of lock parts for them,used material MIM4605, Fe4Ni, FeNi7, 304L and 316L.

    Copyright © 2010-2022 Harber mim-experts.com All Rights Reserved | Sitemap

    Harber Metal firmly believes that quality is the soul of metal parts, and strictly abides by every standard, every process of production, and every detail of service!

    Harber MIM, your total metal component solution

    top
    Send A Message
    Send A Message-

    If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.